基金项目:国家自然科学基金项目(50574076)
作者简介:曹孝君(1974-),男,湖南邵阳人,工学博士,E-mail:cxj7412@sina.com.cn.
作者单位:曹孝君(西南交通大学,土木工程学院,四川,成都,610031)
张继春(西南交通大学,土木工程学院,四川,成都,610031)
吕和林(西南交通大学,土木工程学院,四川,成都,610031)
参考文献:
[1]龙源,冯长根,徐全军,等.爆破地震波在岩石介质中传播特性与数值计算研究[J].工程爆破,2000,6(3):1-7.LONG Yuan,FENG Chang-gen,XU Quan-jun,et al.Study on Propagation Characteristics of Blasting Seismic Waves in Rock Medium and Numerical Calculation[J].Engineering Blasting,2000,6 (3):1-7.
[2]夏祥,李俊如,李海波,等.爆破荷载作用下岩体震动特征的数值模拟[J].岩土力学,2005,26(1):50-56.XIA Xiang,LI Jun-ru,LI Hai-bo,et al.UDEC Modeling of Vibration Characteristics of Jointed Rock Mass Under Explosion[J].Rock and Soil Mechanics,2005,26(1):50-56.
[3]杨伟林,杨柏坡.爆破地震动效应的数值模拟分析[J].地震工程与工程震动,2005,25(1):8-13.YANG Wei-lin,YANG Bai-po.Numerical Simulation of Explosion Seismic Effect[J].Earthquake Engineering and Engineering Vibration,2005,25(1):8-13.
[4]陶颂林.凿岩爆破[M].北京:冶金工业出版社,1986:121-122.TAO Song-lin.Rock Blasting[M].Beijing:Metallurgical Industry Press,1986:121-122.
[5]刘慧.近距侧爆情况下马蹄形隧道动态响应特点的研究[J].爆破与冲击,2000,20(2):175-181.LIU Hui.Study on the Dynamic Response of Hoofshaped Tunnel Resulting from Blasting in Side with Small Distance[J].Explosion and Shock Waves,2000,20(2):175-181.
[6]杨年华,刘慧.近距离爆破引起的隧道周边震动场[J].工程爆破,2000,6(2):6-11.YANG Nian-hua,LIU Hui.Vibration Field at Tunnel Contour Induced by a Close-in Blasting[J].Engineering Blasting,2000,6 (2):6-11.
[7]孙钧,侯学渊.地下结构[M].北京:科学出版社,1991:696-697.SUN Jun,HOU Xue-yuan.Underground Structure[M].Beijing:Science Press,1991:696-697.
[8]阳生权.小线间距施工隧道爆破地震影响下既有隧道围岩线形动力分析[J].工程爆破,1998,4(1):1-6.YANG Sheng-quan.Linear Dynamic Analysis on Rock-media of Old Tunnel Affected by Blasting Vibration of New Tunnel with Small Line-clearance[J].Engineering Blasting,1998,4 (1):1-6.
[9]吴波,高波,索晓明,等.城市地铁小间距隧道施工性态的力学模拟与分析[J].中国公路学报,2005,18(3):84-89.WU Bo,GAO Bo,SUO Xiao-ming,et al.Mechanical Simulation and Analysis of Construction Behavior of Urban Metro Tunnelling with Small Interval[J].China Journal of Highway and Transport,2005,18 (3):84-89.
[10]易长平,卢文波,舒大强,等.爆破震动对新浇混凝土灌注桩影响的数值模拟[J].爆破,2001,18(1):30-35.YI Chang-ping,LU Wen-bo,SHU Da-qiang,et al.Numerical Simulation of Blasting Vibration's Effect on Fresh Concrete Filling Pile[J].Blasting,2001,18 (1):30-35.
[11]刘忠,沈蒲生,陈铖.惯性荷载和地震荷载作用下单桩横向非线性动力响应简化分析[J].中国公路学报,2005,18(3):66-69.LIU Zhong,SHEN Pu-sheng,CHEN Cheng.Simplified Analysis for Lateral Nonlinear Dynamic Response of Single Pile Under Inertial and Seismic Loads[J].China Journal of Highway and Transport,2005,18(3):66-69.
[12]李玉民,倪芝芳.地下工程开挖爆破的地面震动特征[J].岩石力学与工程学报,1997,16(3):274-278.LI Yu-min,NI Zhi-fang.The Characteristics on Surface Vibration of Blasting in Underground Engineering[J].Chinese Journal of Rock Mechanics and Engineering,1997,16(3):274-278.
|