基金项目:交通部科技项目(2003-319-H01-010)
作者简介:徐爱敏(1968-),男,浙江绍兴人,杭州湾大桥工程指挥部高级工程师,浙江大学工学博士研究生, E-mail:13335746588@zj165.com.
作者单位:徐爱敏(浙江大学,土木工程学系,浙江,杭州,310027;杭州湾大桥,工程指挥部,浙江,宁波,315010)
陈衡治(浙江大学,土木工程学系,浙江,杭州,310027)
谢旭(浙江大学,土木工程学系,浙江,杭州,310027)
参考文献:
[1]CRISFIED M A.A Fast Incremental/Iterative Solution Procedure that Handles Snap Through[J].Computer and Structures,1981,13(1):55-62.
[2]AL-RASBY S N.Solution Techniques in Nonlinear Structural Analysis[J].Computer and Structures,1991,40(4):985-993.
[3]BALTOZ J L,DHATT G.Incremental Displacement Algorithms for Nonlinear Problems[J].International Journal for Numerical Methods in Engineering,1979,14(1):1 262-1 266.
[4]MEMON B A,SU Xiao-zu.Arc-Length Technique for Nonlinear Finite Element Analysis[J].Journal of Zhejiang University Science,2004,5(5):618-628.
[5]XIE X,NAGAI M,YAMAGUCHI H.Ultimate Strength Analysis of Long-Span Cable-Stayed Bridges[J].Journal of Structural Mechanics and Earthquake Engineering,1998,44(7):171-181.
[6]XIE X,CHEN H Z,LI H,et al.Numerical Analysis of Ultimate Strength of Concrete Filled Steel Tubular Arch Bridges[J].Journal of Zhejiang University Science,2005,6(8):859-868.
[7]KITIPORNCHAI S,AL-BERMANI F G A,CHAN S L.Geometric and Material Nonlinear Analysis of Structures Comprising Rectangular Hollow Sections[J].Journal of Engineering Structures,1988,10 (1):22-35.
[8]韩林海.钢管混凝土结构[M].北京:科学出版社,2000.HAN Lin-hai.Concrete-Filled Steel Tubular Structure[M].Beijing:Science Press,2000.
[9]蔡绍怀.现代钢管混凝土结构[M].北京:人民交通出版社,2003.CAI Shao-huai.Modern Concrete-Filled Steel Tubular Structure[M].Beijing:China Communications Press,2003.
[10]高雪瞻.碳纤维加固钢筋混凝土结构试验研究[D].杭州:浙江大学,2002.GAO Xue-zhan.Analytical Study of Reinforced Concrete Beams Strengthened Using Carbon Fiber Reinforced Plastic Composites[D].Hangzhou:Zhejiang University,2002.
|