基金项目:国家西部交通建设科技项目(200531881213)
作者简介:张绍阳(1971-),男,山西襄汾人,副教授,博士,E-mail:zhsy@chd.edu.cn.
作者单位:张绍阳(长安大学,信息工程学院,陕西,西安,710064)
王选仓(长安大学,公路学院,陕西,西安,710064)
参考文献:
[1]Kandil A A.Multi-objective optimization for largescale highway construction projects[D].Illinois:University of Illinois at Urbana-Champaign,2005.
[2]季节,胡长顺,郭黎明.公路施工组织网络资源优化的启发式算法[J].西安公路交通大学学报,2001,21(1):37-41.JI Jie,HU Chang-shun,GUO Li-ming.Heuristic algorithms of the network resource optimization for highway construction[J].Journal of Xi'an Highway University,2001,21(1):37-41.
[3]袁剑波,刘伟军,张建仁.考虑多种随机因素的公路工程网络计划技术[J].中国公路学报,2006,19(1):104-107.YUAN Jian-bo,LIU Wei-jun,ZHANG Jian-ren.Network planning technique for highway engineering considering influence of random factors[J].China Journal of Highway and Transport,2006,19 (1):104-107.
[4]姚玉玲,贺晋荣.基于非关键工序组的资源均衡优化方法[J].长安大学学报:自然科学版,2005,25(1):101-104.YAO Yu-ling,HE Jin-rong.Resources optimization based on non-key-work-processes-unit[J].Journal of Chang'an University:Natural Science Edition,2005,25(1):101-104.
[5]李平,顾新一.R&D项目进度费用风险优化的研究[J].管理工程学报,2006,20(2):14-18.LI Ping,GU Xin-yi.Research on optimization of schedule-cost risk for R&D project[J].Journal of Industrial Engineering and Engineering Management,2006,20(2):14-18.
[6]邬晓光,冯祁,郭扬.基于遗传算法的桥梁施工资源有限优化[J].长安大学学报:自然科学版,2004,24(6):33-36.WU Xiao-guang,FENG Qi,GUO Yang.Finite optimization of bridge construction resources based on genetic algorithms[J].Journal of Chang'an University:Natural Science Edition,2004,24(6):33-36.
[7]陆绍凯,武振业.固定资源约束下的网络计划进度优化方法研究[J].重庆建筑大学学报,2005,27(4):88-92.LU Shao-kai,WU Zhen-ye.Study on approach to optimize network planning schedule for fixed resources constraint[J].Journal of Chongqing Jianzhu University,2005,27 (4):88-92.
[8]张绍阳,王选仓.基于Petri网的公路施工资源瓶颈识别和消除[J].长安大学学报:自然科学版,2006,26(1):38-42.ZHANG Shao-yang,WANG Xuan-cang.Bottle-neck identification of resources in highway construction and its elimination methods based on Petri nets[J].Journal of Chang'an University:Natural Science Edition,2006,26(1):38-42.
|