基金项目:国家自然科学基金项目(50278079)
作者简介:彭友松(1965-),男,湖南双峰人,西南交通大学工学博士研究生,从事桥梁结构理论研究.Peng You-song(1965-), male, doctoral student, + 86-28-87634830, pysong@mail. sc. cninfo, net
作者简介:导师:强士中(1941-),男,陕西礼泉人,西南交通大学教授.Qiang Shi-zhong (1941-), male, professor, + 86-28-87634830, qiangshizhong@163. Com.
作者单位:彭友松(西南交通大学,土木工程学院,四川,成都,610031)
强士中(西南交通大学,土木工程学院,四川,成都,610031)
参考文献:
[1]张玥,胡兆同,贾润中.钢筋混凝土连续弯箱梁桥的温度梯度[J].长安大学学报:自然科学版,2006,26(4):58-62.Zhang Yue,Hu Zhao-tong,Jia Run-zhong.Temperature gradient of RC continuous curved box girder bridge[J].Journal of Chang'an University:Natural Science Edition,2006,26(4):58-62.(in Chinese)
[2]彭友松,强士中,李松.哑铃形钢管混凝土拱日照温度分布研究[J].中国铁道科学,2006,27(5):71-75.Peng You-song,Qiang Shi-zhong,Li Song.Temperature distributions in dumbbell cross section concrete-filled steel tube arches due to solar radiation[J].China Railway Science,2006,27(5):71-75.(in Chinese)
[3]彭友松,强士中,李松.圆形空心墩日照温度效应分析[J].桥梁建设,2006,36(4):74-77.Peng You-song,Qiang Shi-zhong,Li Song.Analysis of sunshine thermal effect of cylindrical concrete hollow pier[J].Bridge Construction,2006,36(4):74-77.(in Chinese)
[4]张湧,刘斌,贺拴海,等.桥梁大体积混凝土温度控制与防裂[J].长安大学学报:自然科学版,2006,26(3):43-46.Zhang Yong,Liu Bin,He Shuan-hai,et al.Temperature control and anti-crack of massive concrete in large bridges[J].Journal of Chang'an University:Natural Science Edition,2006,26(3):43-46.(in Chinese)
[5]徐庆元,王平,屈晓晖.高速铁路桥上无缝线路断轨力计算模型[J].交通运输工程学报,2006,6(3):23-26.Xu Qing-yuan,Wang Ping,Qu Xiao-hui.Computation model of rupture force between continuously welded rail and highspeed railway bridge[J].Journal of Traffic and Transportation Engineering,2006,6(3):23-26.(in Chinese)
[6]陈拴发,郑木莲,杨斌,等.破裂水泥混凝土路面板沥青加铺层温度应力影响因素[J].交通运输工程学报,2005,5(3):25-30.Chen Shuan-fa,Zheng Mu-lian,Yang Bin,et al.Thermal stress influence factors of asphalt overlay on cement concrete pavement cracking slab[J].Journal of Traffic and Transportation Engineering,2005,5(3):25-30.(in Chinese)
[7]Elbadry M M,Ghali A.Temperature variations in concrete bridges[J].Journal of Structural Engineering,1983,109(10):2 355-2 374.
[8]刘兴法.混凝土结构的温度应力分析[M].北京:人民交通出版社,1991.
[9]张元海,李乔.桥梁结构日照温差二次力及温度应力计算方法研究[J].中国公路学报,2004,17(1):49-52.Zhang Yuan-hai,Li Qiao.Study of the method for calculation of the thermal stress and secondary force of bridge structure by solar radiation[J].China Journal of Highway and Transport,2004,17(1):49-52.(in Chinese)
[10]刘来君,贺拴海,宋一凡.大跨径桥梁施工控制温度应力分析[J].中国公路学报,2004,17(1):53-56.Liu Lai-jun,He Shuan-hai,Song Yi-fan.Analysis of temperature stress in control of long-span bridge construction[J].China Journal of Highway and Transport,2004,17 (1):53-56.(in Chinese)
[11]JTG D62-2004,公路钢筋混凝土及预应力混凝土桥涵设计规范[S].
[12]JTG D60-2004,公路桥涵设计通用规范[S].
[13]Timoshenko S P,Goodier J N.Theory of Elasticity[M].New York:The McGraw-Hill Companies,Inc.,1970.
|